Quantity Surveying Building Estimation BBS with Excel & CAD
Offered By: Udemy
Course Description
Overview
What you'll learn:
- Quantity Survey, Estimation & Costing Of Industrial Building & Hostel Building Of G+2 ( Excavation To Finishing )
- Able to take Entry level Jobs As a Quantity Surveyor & Estimator
- Bar Bending Schedule Of Footing, Column, Beam & Slab (Foundation To Roof Level)
- Preparing Boq For Pcc, Excavation, Plastering, Concreting, Tmt Steel Etc
- Basic Rate Analysis For Various Items ( PCC, RCC & SHUTTERING )
- Quantity Estimation For Sump Tank & Flag Pole Foundation
- Thumb Rules For Quick Calculations Of Shuttering Materials, Concreting , Centering, Plyboard & Props Required
- Excel Basic Commands And How To Prepare & Use Excel Sheets For Quick Calculations
- Case Studies Of 5bhk House With Interiors Estimation
- Become a Quantity Estimator & Estimate Any Building Like Professional
- Estimate any Building or House Plans with Quick thumb Rules
- Quantity Estimation Of Brickwork, Blockwork, Plastering, Painting, Electrical Tiling Etc
Keywords : Quantity survey , quantity surveying estimation, quantity surveyor Estimation, Construction Management Construction Claims, Civil Engineering ,construction estimation, cost estimation ,construction management, procurement
OVERVIEW OF COURSE
SUB STRUCTURE QUANTITY TAKE OFF ( EXCAVATION, SAND FILLING, PCC, BACK FILLING OF FOOTING & COLUMN TILL PLINTH BEAM LEVEL )
SUPER STRUCTURE QUANTITY TAKE OFF ( PLINTH BEAM,FLOOR BEAM, FLOOR SLAB , ROOF BEAM, ROOF SLAB )
FINISHING ACTIVITIES ( PLASTERING, WALL PUTTY, PAINTING , CEILING PLASTERING, CEILING PUTTY, WALL PAPER, ELECTRICAL ETC )
ESTIMATION & COSTING OF DOG LEGGED STAIRCASE
COMPLETE ESTIMATION & COSTING OF G+2 HOSTEL BUILDING ( EXCAVATION, BACK FILLING, PCC, FOOTING, BEAM, SLAB & STAIRCASE )
BAR BENDING SCHEDULE
Bar Bending of Isolated & Combined Footing
Bar-bending Schedule Of Column Necks And Columns up to G+2 ( Manual + Excel )
Bar-bending Schedule Of Simply Supported Beam, Continuous Beam, Top Extra, Bottom Curtail & Side Face Reinforced Beams
Bar Bending Schedule Of One way Slab, two way Slab, one way Continuous Slab ( Manual + Excel + PPT)
RATE ANALYSIS FOR VARIOUS WORKS
Rate Analysis for PCC
Rate Analysis for RCC
Rate Analysis for Brickwork
Rate Analysis for Block work
Rate Analysis for wall Plastering
Rate Analysis for ceiling Plastering
Rate Analysis for Tiling
Rate Analysis for Reinforcement Works
Thumb Rules for Quick Calculations of Shuttering & Concrete Materials
Thumb rule for finding Footing Shuttering Quantity with footing Concrete Quantity.
Thumb rule for Finding Beam, Column & Slab Shuttering & Centering Quantity with Concrete Quantity.
Quick thumb rules for finding Steel for Slab, Beam, Column .
Bill Of Quantity (B.O.Q)
BOQ For Excavation & Back filling of Soil
BOQ For PCC, Concrete( M-15, M-20 ) & TMT Steel
BOQ For all Finishing Activities (Plastering, Brickwork, Wall putty , ceiling Plastering, Painting etc )
MISCELLANEOUS LECTURES
Estimation & Costing of Under Ground Water tank of 50 Kl ( EXCEL CALCULATIONS )
Estimation & Costing of Flag pole Foundation ( Raft Foundation & RCC Pedestal Covered )
Estimation & Costing of 5 BHK House Plan with all Interiors ( Case Study )
All Explanation has Been done with Live Project Photos & videos .
Taught by
Akshay Kamath
Related Courses
工程圖學 3D CADNational Taiwan University via Coursera 3D CAD Application
National Taiwan University via Coursera 3D CAD Fundamental
National Taiwan University via Coursera 3D Model Creation with Autodesk Fusion 360
Autodesk via Coursera 3D Printing and Additive Manufacturing
University of Illinois at Urbana-Champaign via Coursera